Kolkata Metro Line 3
This article needs additional citations for verification. (September 2016) |
Kolkata Metro Line 3 Diamond Park - Esplanade Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Phase 1 - Operational
Phase 2 - Under Construction Phase 3 - Planned | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Diamond Park (South) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connecting lines | Blue Line Green Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 7 (operational) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Kolkata Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Metro Railway, Kolkata | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 30 December 2022 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 18.47 kilometres (11.48 mi)
Operational: 7.75 kilometres (4.82 mi) Under Construction: 7.33 kilometres (4.55 mi) Planned: 3.39 kilometres (2.11 mi) broad gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC using third rail[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph) (designed) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Kolkata Metro Line 3 or the Purple Line is a line of the
Development
Around 8.5 kilometres (5.3 mi) of the project will be elevated and the rest of 6.32 kilometres (3.93 mi) of the metro line will be underground.[4] The project is getting delayed due to nonavailability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[7] Tenders for its construction and plant & machinery were invited in April 2020.[8]
Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.
Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.
By 15 September 2022, the stretch from Joka to Taratala has been fully constructed and electrification has been done. Testing trials are underway from Joka to Taratala using the old decommissioned Metro Rakes. Eventually in service there will be new air conditioned metro rakes. The stretch from Majerhat to Esplanade is under construction.
Prime Minister Narendra Modi inaugurated the Joka-Taratala stretch, including Joka metro station of Kolkata Metro's Purple Line on 30 December 2022 in the presence of West Bengal Chief Minister Mamata Banerjee and Indian Railway Minister Ashwini Vaishnaw. Some students from schools especially St Thomas Boys School, whose premises are utilised for planned Khidirpur metro station in this stretch, were granted the rare opportunity to be the first ones to ride in this Joka-Taratala stretch after the inauguration.[9][10][11]
After lot of hardships and developmental work the Taratala-Majerhat section of Kolkata Metro Line 3 was inaugurated on 6 March 2024 by Prime Minister Narendra Modi, along with the truncated sections of Esplanade-Howrah Maidan under Line 2 and Kavi Subhash-Hemanta Mukhopadhyay under Line 6.[12] The Mominpur-Esplanade section is expected to be open in 2028. [13]
List of stations
The work has been sanctioned in 2010-11 for the new Metro line from
There are 3 phases in this line-
- Joka to Majherhat (Operational)
- Majherhat to Esplanade (Under construction)
- Diamond Park to Joka (Planned)
Line 3 (Purple Line) | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Location | Phase | Opening | Connections | Layout | Coordinates | Notes | ||||||
English | Bengali | |||||||||||||
1 | Diamond Park
|
ডায়মন্ড পার্ক | Joka | 3 | Planned | Vivekananda Mission School Bus Stop | Elevated | |||||||
2 | IIM Calcutta
|
আইআইএম | ||||||||||||
3 | Joka
|
জোকা | Joka | 1A | Operational | Joka bus Depot | Elevated | Also known as Diamond Park | ||||||
4 | Thakurpukur | ঠাকুরপুকুর | Thakurpukur | |||||||||||
5 | Sakher Bazar | সখেরবাজার | Behala | Also known as Silpara | ||||||||||
6 | Behala Chowrasta | বেহালা চৌরাস্তা | ||||||||||||
7 | Behala Bazar | বেহালা বাজার | ||||||||||||
8 | Taratala | তারাতলা | Taratala | Also known as Pathakpara | ||||||||||
9 | Majerhat | মাঝেরহাট | Majerhat | 1B | Majerhat Station
|
|||||||||
10 | Mominpur | মোমিনপুর | Mominpur | 2A | Under Construction | Mominpore Bus Stop | Elevated | |||||||
11 | Khidirpur | খিদিরপুর | Kidderpore | 2B | Khidirpur Station | Underground | ||||||||
12 | Victoria | ভিক্টোরিয়া | Maidan | Hastings Tram Stop | Also known as Hastings | |||||||||
13 | Park Street | পার্ক স্ট্রিট | Park Street | Park Street Bus Stop | ||||||||||
14 | Esplanade | এসপ্ল্যানেড | Esplanade | International Bus Terminus. Also known as Dharmatala / Chowringhee |
Gallery
-
ICF Medha rake MR 418 on the day of inauguration of line 3 at Joka metro station
-
The day of inauguration of phase 1
See also
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- 2018 Kolkata bridge collapse
- Kolkata Suburban Railway
References
- ^ "Kolkata Metro Map".
- ^ "CAF to supply Kolkata metro trains". Railway Gazette. 9 September 2012. Retrieved 6 September 2018.
- ^ "Kolkata Metro: First glimpse of Joka-Taratala route in pics". mint. 30 December 2022. Retrieved 30 December 2022.
- ^ a b Bandyopadhyay, Krishnendu; Chakraborty, Ajanta (10 June 2019). "Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.
- ^ "PM Modi unveils multiple metro projects, including Kolkata underwater corridor". The Hindu. 6 March 2024. Retrieved 6 March 2024.
- ^ "Kolkata Metro Line 3".
- ^ Bandyopadhyay, Krishnendu (1 March 2019). "Work begins at Joka Metro depot, wall built | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.
- ^ "RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot". The Metro Rail Guy. 28 April 2020. Retrieved 29 April 2020.
- ^ "Kolkata Metro: First glimpse of Joka-Taratala route in pics". www.livemint.com. 30 December 2022. Retrieved 30 December 2022.
- ^ "In-pics: Inaugration of Vande Bharat Express, Joka-Taratala Metro & more news from Kolkata". www.telegraphindia.com. Retrieved 31 December 2022.
- ISSN 0971-8257. Retrieved 2 May 2023.
- ISSN 0971-8257. Retrieved 21 February 2024.
- ^ MP, Team (10 October 2023). "RVNL targets completion of Majerhat to Esplanade Metro stretch within 48 months". www.millenniumpost.in. Retrieved 17 March 2024.