Bharatmala
Bharatmala | |
---|---|
Country | India |
Ministry | Ministry of Road Transport and Highways |
Established | 31 July 2015 |
Status | Active |
This article is part of a series on the |
Politics of India |
---|
India portal |
The Bharatmala Pariyojna (lit. 'India garland project') is an ongoing project that will interconnect 550 District Headquarters (from current 300) through a minimum 4-lane highway by raising the number of corridors to 50 (from current 6) and move 80% freight traffic (40% currently) to National Highways by interconnecting 24 logistics parks, 66 inter-corridors (IC) of total 8,000 km (5,000 mi), 116 feeder routes (FR) of total 7,500 km (4,700 mi) and
Other than NHDP related projects which are greenfield, there is Brownfield National Highway Projects which is a upgradation/widening of existing 4 lane highways into 6 lane highways which are not controlled access highways.[4] Many state highways have been converted to National Highways under this project.[5]
It is both enabler and beneficiary of other key Government of India schemes, such as Sagarmala, Dedicated Freight Corridors, Industrial corridors, UDAN-RCS, BharatNet, Digital India, Parvatmala and Make in India.
Scope
Context
NHIDCL
Central Road Fund (CRF)
Central Road Fund (CRF) was created as a non-lapsable fund under the "Central Road Fund Act 2000", by imposing a
Impact
Bharatmala will significantly boost highway infrastructure:[1]
- Raise 6 NC corridors to 50 corridors (6 NC and 44 EC)
- Raise 40% freight to 80% freight on National Highways
- Raise 300 districts to 550 districts connected by minimum 4-lane highways.
Components
National Highways Development Project (NHDP)
NHDP project covers 48,793 km (30,319 mi), including 28,915 km (17,967 mi) completed, 10,574 km (6,570 mi) under construction and 9,304 km (5,781 mi) left for award (as of May 2017).[11] The uncompleted projects under NHDP will also be subsumed in Bharatmala.[6] NHDP was meant to convert dirt roads into National Highways or any 1/2 lane roads into 4 lane national highways.
National Corridors (NC)
National Corridors of India (NC) are 6 high volume corridors, including 4 in Golden Quadrilateral and 2 in North–South and East–West Corridors, including Mumbai - Kolkata Highway (NH6), known as East Coast - West Coast Corridor, that carry 35% of India's freight.[6] Lane expansion to 6 to 8 laning, ring roads, bypasses and elevated corridors will be built in Bharatmala to decongest the National Corridors.[6] Logistics Parks will be set up along the NC.[6] Busiest stretches of National Corridors will be converted to the expressways.[6] 8,000 km (5,000 mi) inter-corridor and 7,500 km (4,700 mi) feeder routes will be built.[6] Additionally, 3,300 km (2,100 mi) of border roads and 2,000 km (1,200 mi) international highways will be built to connect 6 National Corridors to international trade routes.[6]
National Corridors Efficiency Program (NCEP)
National Corridors Efficiency Program (NCEP) entails 5,000 km (3,100 mi) phase-I decongestion of 185 choke points by 34 6-8 laning, 45 bypasses and 30 ring roads of 6 NC.[6][1] [12]
New ring roads in Bharatmala include:
Economic Corridors
Economic Corridors of India or Industrial Corridors of India, 44 corridors 26,200 km (16,300 mi) were identified and 9,000 km (5,600 mi) will be taken up in phase-I, they exclude 6 National Corridors, they include:[1] 66 8,000 km (5,000 mi) inter-corridors (IC) & 116 7,500 km (4,700 mi) feeder routes (FR) were identified for Bharatmala.[1][6]
List of 44 economic corridors (EC):[1]
- EC-1: Mumbai-Kolkata
- EC-2: Mumbai-Kanyakumari
- EC-3: Amritsar-Jamnagar
- EC-4: Kandla-Sagar
- EC-5: Agra-Mumbai
- EC-6: Pune-Vijayawada
- EC-7: Raipur-Dhanbad
- EC-8: Ludhiana-Ajmer
- EC-9: Surat-Nagpur
- EC-10: Hyderabad-Panaji
- EC-11: Jaipur-Indore
- EC-12: Solapur-Nagpur
- EC-13: Sagar-Varanasi
- EC-14: Kharagpur-Siliguri
- EC-15: Raipur-Visakhapatnam
- EC-16: Delhi-Lucknow
- EC-17: Chennai-Kurnool
- EC-18: Indore-Nagpur
- EC-19: Chennai-Madurai
- EC-20: Mangaluru-Raichur
- EC-21: Cochin
- EC-22: Bellary-Gooty
- EC-23: Hyderabad-Aurangabad
- EC-24: Delhi-Kanpur
- EC-25: Tharad-Phalodi
- EC-26: Mandi Dabwali
- EC-27: Sagar-Lucknow
- EC-28: Sambalpur-Paradeep
- EC-29: Vadodra
- EC-30: Godhra-Khargone
- EC-31: Sambalpur-Ranchi
- EC-32: Bengaluru-Malappuram
- EC-33: Raisen-Pathariya
- Mangaluru
- EC-35: Chittaurgarh-Indore
- EC-36: Bilaspur-New Delhi
- EC-37: Mahabubnagar
- EC-38: Bengaluru-Nellore
- EC-39: Ajmer-Udaipur
- EC-40: Sirsa-Delhi
- EC-41: Sirohi-Beawar
- EC-42: Jaipur-Agra
- EC-43: Pune-Aurangabad
- EC-44: North East Corridor
Logistics parks
Logistics parks entailing 45% of India's freight traffic have been identified to be connected by Bharatmala economic corridors (EC), to develop hub-and-spoke model where hub-to-hub transport can be done with 30 tonne trucks and hub-to-spoke transport can be done with 10 tonne trucks. Currently all transport is point-to-point in 10 tonne trucks (2017).[1][12]
- Ambala
- Bengaluru
- Bathinda
- Bhopal
- Chennai
- Cochin
- Coimbatore
- Guwahati
- Hisar
- Hyderabad
- Indore
- Jagatsinghpur
- Jaipur
- Jammu
- Kandla
- Kolkata
- Kota
- Nagpur
- Nashik
- Panaji
- Patna
- Pune
- Raipur
- Rajkot
- Solan
- Sundargarh
- Valsad
- Vijayawada
- Visakhapatnam
- North Gujarat
- South Gujarat
- North Punjab
- South Punjab
- Delhi-NCR
- Delhi
- Faridabad
(IMT Manesar) - Narnaul
(Nangal Choudhary IMHL) - Ghaziabad
- MMR
- Mumbai
- Mumbai suburbs
- Jnpt
- Mumbai Port
- Thane
- Raigad
Northeast India connectivity
North East Economic corridor will connect 7 state capitals and 7 multimodal waterways terminals on
International connectivity
- 24 Integrated check posts (ICPs)
- Transit through Bangladesh to improve Northeast India
- Integrating Bangladesh–Bhutan–Nepal-Myanmar–Thailand BIMSTEC corridors.
Finance
- Total budget ₹692,324 crore (US$83 billion) for 5 years Bharatmala project from 2017 to 2022.[13]
- ₹157,324 crore (US$19 billion) existing NH projects subsumed under Bharatmala, such as incomplete SARDP-NE, Externally Aided Projects (EAP, e.g. world Bank and ADB), and Left Wing Extremism roads (LWE).[6]
- ₹535,000 crore (US$64 billion) phase-I to be completed during 2017-dec 2019:[6][14][13]
- ₹157,324 crore (US$19 billion) existing NH projects subsumed under Bharatmala, such as incomplete
- Fy2017-18:[15]
- 10,000 km (6,200 mi) highways built at the rate of 27 km/day,
- ₹65,000 crore (US$7.8 billion) through allocation in the national budget.
- Fy2018-19:[15]
- 24,000 km (15,000 mi) will be awarded.
- 12,000 km (7,500 mi) will be completed.
- ₹163,000 crore (US$20 billion) total spend:
- ₹78,000 crore (US$9.3 billion) through allocation in the national budget,
- ₹60,000 crore (US$7.2 billion) through bonds,
- ₹25,000 crore (US$3.0 billion) through toll monetisation of 30 completed highways.
Implementation phases: 2017-2022
The plan envisages the construction of 83,677 km (51,994 mi) roads, including 34,800 km (21,600 mi) of additional highways and roads across the country,
Phase 1: 34,800 km by December 2022
The total length of 34,800 km (21,600 mi) highways will be constructed under phase-I by December 2022, including 24,800 km (15,400 mi) of new highways and another 10,000 km (6,200 mi) currently under-construction remaining incomplete under NHDP, compared to 19 years it took to upgrade almost same length of National Highways under NHDP.[17][16][3][18]
Road Type | Total Length[6] | Phase-I Length[6] | Notes |
---|---|---|---|
Economic Corridors | 26,200 km (16,300 mi) | 9,000 km (5,600 mi) | 44 EC corridors exclude 6 NC.[1] |
Inter-corridor & feeder Routes | 15,500 km (9,600 mi) | 6,000 km (3,700 mi) | 66 8,000 km (5,000 mi) inter-corridors (IC) & 116 7,500 km (4,700 mi) feeder routes (FR).[1][6] |
National Corridors Efficiency Program | 5,000 km (3,100 mi) | 6-8 laning, bypasses and ring roads of 6 NC.[6] | |
Border & International connectivity roads | 5,300 km (3,300 mi) | 2,000 km (1,200 mi) | 3,300 km (2,100 mi) of |
Coastal & Port connectivity roads | 2,000 km (1,200 mi) | Synergy with Sagarmala .
| |
Expressways | 1,600 km (990 mi) | 800 km (500 mi) | NC stretches converted to expressway.[6] |
Total under Bharatmala Pariyojana | 24,800 km (15,400 mi) | ||
NH remaining under NHDP | 10,000 km (6,200 mi) | 10,000 km (6,200 mi) | |
Total to be built or upgraded | 83,677 km (51,994 mi)[3] | 34,800 km (21,600 mi) |
Phase-II: 48,877 km (expected 2024)
Multimodal logistics parks. It will make current corridors more effective & will improve connectivity with north east and leverage synergy with inland waterways.
Multi-modal logistics parks will provide seamless cargo transfer between Railways cargo, Inland Waterways, Air cargo, Dedicated Freight Corridors, Access-Controlled Expressways, National Highways, State Highways in a Hub and Spoke model.
See also
- Similar rail development
- Future of rail transport in India, rail development
- Similar roads development
- Bharatmala components or predecessors
- Diamond Quadrilateral, Subsumed in Bharatmala
- Golden Quadrilateral, completed national road development connectivity older scheme
- National Highways Development Project, Subsumed in Bharatmala
- North-South and East-West Corridor, Subsumed in Bharatmala
- India-China Border Roads, Subsumed in Bharatmala
- Expressways of India
- Setu Bharatam, river road bridge development in India
- Similar ports and river transport development
- Char Dham Highway
- Indian Rivers Inter-link
- List of National Waterways in India
- Sagar Mala project, national water port development connectivity scheme
- Similar air transport development
- Indian Human Spaceflight Programme
- UDAN, national airport development connectivity scheme
- Highways in India
- List of National Highways in India by highway number
- List of National Highways in India
- General
References
- ^ a b c d e f g h i j k l Bharatmala presentation
- ^ a b "Bharat Mala: PM Narendra Modi's planned ₹14,000 crore (US$1.7 billion) road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015
- ^ a b c d "Ministry proposes construction of 20,000 km of roads under Bharat Mala project", The Economic Times, New Delhi, 9 January 2016
- ^ "Brownfield National Highway Project | CEPT - Portfolio".
- ^ "Centre to convert State Highways with high traffic to national highways: Gadkari". 15 October 2022.
- ^ a b c d e f g h i j k l m n o p q r s BHARATMALA PARIYOJANA, PHASE-I
- ^ "Home | Know India: National Portal of India". Archived from the original on 16 August 2017.
- ^ National Highway Infrastructure Development Corporation Limited to award first project for North-East in October, Economic Times, 9 Oct 9 2014.
- ^ NHIDCL intro.
- ^ What is Central Road Fund (CRF)?, Indian Economy.
- ^ "About NHDP | National Highways Authority of India, Government of India". nhai.gov.in. Retrieved 3 February 2018.
- ^ a b Investment approval for Phase 1
- ^ a b c d e f g h new release
- ^ "Govt plans Bharat Mala, a 5,000km road network", The Times of India, New Delhi, 30 April 2015
- ^ a b c Transport ministry seeks Rs 78,000 crore to help fund Bharatmala, Economic Times, 24 Dec 2017.
- ^ a b Nitin Gadkari press conference highlights: BharatMala, SagarMala to be 'varmala' of India, says minister, First Post, 25 Oct 2017.
- ^ "First phase of Bharatmala Pariyojana to start by end of 2018: Gadkari". Moneycontrol. Retrieved 29 October 2017.
- ^ "Highway construction target for Nitin Gadkari-led Road Transport Ministry: Is 30 km per day too much of a stretch?". The Financial Express. 5 June 2017. Retrieved 8 August 2017.
External links